Skip to content
Centerline Inc. logoCENTERLINE.
Centerline1 min read

Texas Design 2 Part Show March 13 and 14

Texas Design 2 Part Show March 13 and 14

Texas Design 2 Part Show March 13 and 14

Join Centerline, Inc. in Booth 418 ! where we will be meeting, greeting, and showcasing our contract machining and grinding capabilities, machine tool spindle repair services, and our custom spindle manufacturing capabilities.

We are always on the lookout for new partnerships and have found the D2P Tradeshows to be an excellent place to find quality suppliers, discover new manufacturing technologies, and solve manufacturing problems. Join us!

Download VIP E-Ticket Design 2 Part (D2P)March 13 and 14Grapevine TexasWednesday 9:30 am to 3:30 pmThursday 9:30 am to 3:00 pm Gaylord Texan Convention Center 1501 Gaylord TrailGrapevine, Texas 76051

Related articles

Beyond the Wrench: My Conversation with Sean Archer
vlog

Beyond the Wrench: My Conversation with Sean Archer

On Maintenance & Manufacturing Insights, Sean Archer — a maintenance manager in heavy steel manufacturing leading a team of 13 — shares how preventive and predictive maintenance, root cause analysis, and modern controls like Allen-Bradley and Rockwell are reshaping the skills the plant floor demands.

Read →
From Nuclear Submarines to Napa Valley: My Conversation with Joshua Kroll
vlog

From Nuclear Submarines to Napa Valley: My Conversation with Joshua Kroll

On Maintenance & Manufacturing Insights, Joshua Kroll — Facilities Maintenance Supervisor at Trinchero Family Estates and a former Marine Corps and Navy nuclear submarine officer — shares how he prepares a winery for harvest season, grows technicians internally, troubleshoots by challenging assumptions, and puts AI to practical use in maintenance.

Read →
Preventive Maintenance Starts with Preparation: My Conversation with Nathan Santiago
vlog

Preventive Maintenance Starts with Preparation: My Conversation with Nathan Santiago

On Maintenance & Manufacturing Insights, Nathan Santiago, Facilities Engineer at C&H/New Holland, shares how large manufacturing operations reduce downtime — tailoring preventive maintenance to real operating conditions, positioning tools near critical equipment, and using data-driven process improvements to eliminate hundreds of hours of lost production.

Read →