Skip to content
Centerline Inc. logoCENTERLINE.
Centerlinespindle-repair1 min read

How Did They Film Predator Up There?

On a family trip to Puerto Vallarta, Martin Engster visited the jungle where The Predator was filmed — and couldn't stop thinking like a machine guy about the logistics of getting the gear up there in the 1980s.

How Did They Film Predator Up There?

My family and I went to Puerto Vallarta. We got to see the place where they filmed The Predator with Arnold Schwarzenegger. I'm an '80s kid — I grew up on that movie.

The ride up was more than half an hour on a rough dirt road in the back of a truck.

The whole time I was thinking like a machine guy: how did they get all that camera gear up there in the '80s? Back then it was mostly jungle and rocks. The logistics alone are mind-blowing.

Watch & Listen

Related articles

The Power of Planning Ahead: My Conversation with Richard Horn
vlog

The Power of Planning Ahead: My Conversation with Richard Horn

On Maintenance & Manufacturing Insights, I talk with Richard Horn, a production supervisor at Ford Motor Company, about keeping high-volume automotive lines running — how producing 1,200 extra parts one day bought his team a day and a half when a stamping die broke, why cleanliness speeds up troubleshooting, and the growing shortage of skilled tradespeople.

Read →
From Preventive Maintenance to 3D Printing: My Conversation with Richard Kaczmarek
vlog

From Preventive Maintenance to 3D Printing: My Conversation with Richard Kaczmarek

On Maintenance & Manufacturing Insights, I talk with Richard Kaczmarek — with experience from Briggs & Stratton, Gulfstream, and GE Aviation — about why maintenance should never be the first budget cut, what happens when technology outpaces training, and how 3D scanning and printing let him recreate a custom aircraft wingtip for a fraction of the usual cost.

Read →
Beyond the Breakdown: My Conversation with Jay Olivo
vlog

Beyond the Breakdown: My Conversation with Jay Olivo

On Maintenance & Manufacturing Insights, Jay Olivo — an engineering and reliability manager, leadership trainer, and author — shares how he cut reactive maintenance to under 20% and hit ~93% on-time preventive maintenance by pairing a CMMS with leadership his team actually bought into.

Read →